Close

1. Identity statement
Reference TypeConference Paper (Conference Proceedings)
Siteplutao.sid.inpe.br
Holder Codeisadg {BR SPINPE} ibi 8JMKD3MGPCW/3DT298S
Identifier8JMKD3MGP3W/3FCL3FG
Repositorysid.inpe.br/plutao/2013/12.12.15.14.38
Last Update2014:10.10.13.11.16 (UTC) administrator
Metadata Repositorysid.inpe.br/plutao/2013/12.12.15.14.39
Metadata Last Update2021:02.11.18.16.24 (UTC) administrator
ISBN2176-5480
Labellattes: 8570066116759027 1 Bambace:2013:RODEMA
Citation KeyBambace:2013:RoDeMa
TitleOn the robust decisions making in projects
FormatDVD
Year2013
Access Date2024, May 18
Secondary TypePRE CI
Number of Files1
Size542 KiB
2. Context
AuthorBambace, Luís Antônio Waack
Resume Identifier8JMKD3MGP5W/3C9JHMG
GroupDMC-ETE-INPE-MCTI-GOV-BR
AffiliationInstituto Nacional de Pesquisas Espaciais (INPE)
Author e-Mail Addressluis.bambace@inpe.br
e-Mail Addressluis.bambace@inpe.br
Conference NameInternational Congress of Mechanical Engineering, 22 (COBEM).
Conference LocationRibeirão Preto
Date3-7 Nov. 2013
PublisherABCM
Book TitleProceedings
Tertiary TypeArtigo
History (UTC)2013-12-12 15:14:39 :: lattes -> administrator ::
2021-02-11 18:16:24 :: administrator -> marcelo.pazos@inpe.br :: 2013
3. Content and structure
Is the master or a copy?is the master
Content Stagecompleted
Transferable1
Content TypeExternal Contribution
Version Typepublisher
KeywordsTRIZ
Pugh Matrix
Multi Criteria Decision Method
risk
avaliação de riscos
decisão multicritério
avaliação do esforço de desenvolvimento
seleção de alternativas
Método de Pugh
AbstractThis paper addresses a procedure for robust decision making in high reliability engineering projects. It uses more than one Multi Criteria Decision Method and the Kendall rank correlation to evaluate the decisions reliability. Many risk data are considered: human errors (Jelinsky-Moranda-Mils), mis-documentation (sampling), adequacy of resources for the development (information entropy), lack of specification, proper solutions space exploration (S curves), overall project success chance (joint statistics), obsolescence risks, among others. In designing an item with hundreds of thousand failure modes, parallel solutions shall be employed, in order to assure at least a solution, and the decision frame shall point the priorities correctly. Techniques like TRIZ and Pugh Matrix assure that enough feasible solutions are considered in the early design phase. High reliability complex systems are deceiving, in a 170,000 failure modes one, even a 5 standard deviation failure margin in each mode, means a 4.7% overall failure chance. The method will be illustrated with horizontal axis wind turbines, the Maglev vertical axis wind turbine, the Magenn airborne wind turbine, and the airborne driven ground generation system air strip.
AreaETES
Arrangementurlib.net > BDMCI > Fonds > Produção anterior à 2021 > DIDMC > On the robust...
doc Directory Contentaccess
source Directory Contentthere are no files
agreement Directory Contentthere are no files
4. Conditions of access and use
data URLhttp://urlib.net/ibi/8JMKD3MGP3W/3FCL3FG
zipped data URLhttp://urlib.net/zip/8JMKD3MGP3W/3FCL3FG
Languagept
Target File545bambace.pdf
User Grouplattes
marcelo.pazos@inpe.br
Reader Groupadministrator
marcelo.pazos@inpe.br
Visibilityshown
Read Permissionallow from all
Update Permissionnot transferred
5. Allied materials
Mirror Repositoryiconet.com.br/banon/2006/11.26.21.31
Next Higher Units8JMKD3MGPCW/446AF4B
URL (untrusted data)http://www.cobem2013.com.br
Host Collectiondpi.inpe.br/plutao@80/2008/08.19.15.01
6. Notes
Empty Fieldsarchivingpolicy archivist callnumber copyholder copyright creatorhistory descriptionlevel dissemination doi edition editor issn lineage mark nextedition notes numberofvolumes orcid organization pages parameterlist parentrepositories previousedition previouslowerunit progress project publisheraddress rightsholder schedulinginformation secondarydate secondarykey secondarymark serieseditor session shorttitle sponsor subject tertiarymark type volume
7. Description control
e-Mail (login)marcelo.pazos@inpe.br
update 


Close